Users should be familiar with the proper operation of Diesel generator. This is important for ensuring personnel safety and the reliability of power backup system equipment. Please follow the following standardized operating procedures:
1. Pre-Operation Checks
Inspect fuel/oil/coolant levels, ensuring no leaks exist in the Diesel generator system.
Verify battery terminals are clean and securely connected to prevent ignition failure.
Clear debris within a 2-meter radius of the Diesel generator to maintain ventilation.
2. Startup Sequence
Engage the emergency stop switch in the "OFF" position before activation.
Allow the Diesel generator to complete its self-test cycle (if equipped) before loading.
Gradually apply electrical loads in increments (≤20% steps) to avoid sudden strain.
3. Runtime Monitoring
Continuously track exhaust temperature and oil pressure via the Diesel generator control panel.
Never exceed 80% of the rated load capacity for prolonged periods.
Immediately shut down if abnormal vibrations or smoke emissions occur.
4. Shutdown & Maintenance
Gradually reduce loads to zero before turning off the Diesel generator.
Let the engine idle for 3-5 minutes to cool down turbocharger components.
Document all operational logs including runtime hours and fault alerts.
Diesel generator Adherence to these procedures minimizes risks of combustion hazards, mechanical failures, and compliance violations.
More information about Diesel generator:https://wffdj.com/