Before deploying a container substation, ensure the installation site meets necessary requirements. Level ground with proper drainage prevents water accumulation around the unit. The location should allow for safe cable connections and maintenance access while considering future expansion needs.
Transportation and Installation of Container Substations
Specialized equipment is required when moving container substations due to their weight and sensitive components. Use lifting points specified by the manufacturer and avoid sudden movements during transportation. Upon arrival, verify all internal components remain properly secured after transit.
Electrical Connections
Qualified personnel should handle all connections to the container substation. Follow local electrical codes and manufacturer guidelines for cable entry points and termination procedures. Ensure proper earthing systems are installed before energizing the unit.
Commissioning Process of Container Substations
Systematically test all container substation components before full operation. This includes insulation resistance checks, protection device verification, and transformer testing. Gradually increase voltage during initial power-up while monitoring for abnormalities.
Operational Monitoring of Container Substations
Implement regular inspection routines for container substations in service. Monitor temperature indicators, oil levels (for oil-filled transformers), and audible alarms. Keep ventilation openings clear and maintain proper clearance around the unit.
Schedule preventive maintenance according to the manufacturer's recommendations. Container substations require periodic cleaning, tightening of electrical connections, and functional testing of protective devices. Document all maintenance activities for equipment history.